Cavity Production Pilot Plant: April 12 -, 2010


[ Previous batch | Following batch]




April 12, 2010: - Cavity Production Pilot Plant under construction. It is being built inside a clean room area of approximately 14 m x 19 m, created within the former PS Energy Center which was refurbished in 2009. It will feature a press machine with a capacity of 150t, a cell trimming machine based on a CNC lathe, a set of equipment for chemical polishing, an electron beam welding machine and associated hardware. As of April 2010, the clean room floor is basically ready and a lathe and a press machine have been installed. An EBW machine will be installed in early Spring of 2011.


20100412Di-0192 20100412Di-0199

20100412Di-0080 20100412Di-0093 20100412Di-0084 20100412Di-0116 20100412Di-0119

20100412Di-0018 20100412Di-0025 20100412Di-0029 20100412Di-0034

20100412Di-0139 20100412Di-0145 20100412Di-014752 20100412Di-016065





Last modified: Fri Apr 16 08:41:48 JST 2010