WG 1: Overall Design

Topics

Discuss on the overall design including the conventional facilities. The topics include:

  • Choice of the initial and final stage energies and the accelerating gradient.
  • Review of the machine parameters and their inter-relationship. Clarify the impact of their choices on the machine design.
  • Conventional facilities for the main liacs: Two-tunnels vs single-tunnel.
  • Damping ring design: Dog-bones to share the tunnels with the main linacs vs rings in separate tunnels.
  • Positron source: Undulator-based vs conventional designs. Priority of the polarized positrons?
  • Beam crossing angle at the interaction point.
  • Beam dynamics issues. Tolerances.

In Short...

Program (Annotated: 08:22, Nov.15, 2004)

All presentations are to be made with computer projectors. OHP presentations are not supported. Please, make sure to give a copy of your presentation files to the WG scientific secreatry (the name shown at the bottom of this page) who carries a USB memory stick.

Day 1 (Nov.13) Afternoon
XFEL: 14:45-15:15 (WG1-WG2 Joint, Chair: D.Schulte)
XFEL and ILCR.Brinkmann (DESY)

Beam Dynamics, Tolerance, Instrumentation: 15:15-17:30 (WG1-WG2 Joint, Chair: D.Schulte)
Beam Operation Experiences H.Weise (DESY)
Beam Instrumentation M.Ross (SLAC)
Beam Dynamics P.Tenenbaum (SLAC)
Wakefield J.Sekutowicz (DESY)
Discussion D.Schulte (CERN)

Day 2 (Nov.14)
Requirement from Particle Physics (Chair: K.Kubo) : 9:00 - 9:30
ILCSC Parameter Subcommittee Report D.Son (Kyungpook Nat. U.)
Q&A

Beam and RF Parameters - 1 (Chair: K.Kubo) : 9:30 - 12:00
Parameter Optimization Review N.Walker (DESY)
Discussion
      ContributionH.Padamsee (Cornell)
      ContributionC.Adolphsen (SLAC)
      ContributionK.Kubo (KEK)

High-Gradient Issues: 13:00-13:45 (WG1-WG2-WG5 Joint, Chair: T.Raubenheimer)
WG5 Report, ProspectsH.Padamsee (Cornell)
Cost and Operational Implications of the Gradient ChoiceC.Adolphsen (SLAC)
Operations Parms and Configs for 35-50MV/mY.H.Chin (KEK)
DiscussionT.Raubenheimer (SLAC)

High-Gradient Issues Cont. (Chair: T.Raubenheimer) : 13:45 - 14:00
Discussion (WG1 only)

Common Database and Simulation Tools (Chair: D.Schulte) : 14:00 - 14:40
Database and Simulation Codes K.Furukawa (KEK)
Beam Simulations and Code Repository P.Burrows (QMUL)
Discussion

Single- vs Two-Tunnels (Chair: K.Kubo) : 14:50 - 15:40
Deciding the Right Number of Tunnels: 1 or 2 or 3T.Himel (SLAC)
Comments from Safety Regulations StandpointR.Sugahara (KEK)
Discussion K.Kubo (KEK)

Commissioning Issues (WG1-WG3 Joint, Chair: K.Oide) : 15:45 - 17:30
Commissioning Strategies vs DesignN.Phinney (SLAC)
DiscussionK.Oide (KEK)
      ContributionK.Oide (KEK)

Day 3 (Nov.5) Morning
Beam and RF Parameters - 2 (Chair: T.Raubenheimer) : 9:00 - 10:00
Parameter Choices T.Raubenheimer (SLAC)
Parameter Table T.Raubenheimer (SLAC)
Discussion

Preparation of Summary: 10:00 - 11:00
Discussion + Work

Conveners

  • Kiyoshi Kubo (x4454)
  • Daniel Schulte
  • Tor Raubenheimer

Scientific Secretary

  • Kiyoshi Kubo (Dual Role, x4454)
*
KEK LC Office
Last modified: Thu Sep 15 21:05:27 JST 2005