Contributions to PAC1997
May 12-17, Vancouver

This page compiles contributions to the PAC97 conference from the accelerator R&D group for the JLC. Some papers, which are not written by the group members, but are considered relevant or interesting, are also included. For full listing of all the papers at PAC97, go to http://accelconf.web.cern.ch/accelconf/pac97/papers/index.html.


2V043 -- TEST OF OPTICS DIAGNOSTICS IN ATF

2W008 -- A CONVENTIONAL READ-OUT ELECTRONICS FOR THE BUTTON-TYPE BPM IN THE ATF DAMPING RING

2W009 -- DESIGN STUDY OF COOLING WATER SYSTEM FOR A LARGE SCALE LINEAR COLLIDER

2W010 -- SR MONITOR FOR THE ATF DAMPING RING

2W011 -- STATUS OF 1.54 GeV ATF LINAC

2W013 -- EFFICIENCY ISSUE IN C-BAND KLYSTRON-MODULATOR SYSTEM FOR LINEAR COLLIDER

3P042 -- USE OF A VIRTUAL ACCELERATOR FOR A DEVELOPMENT OF AN ACCELERATOR CONTROL SYSTEM

3V016 -- SPATIAL COHERENCY OF THE SYNCHROTRON RADIATION AT THE VISIBLE LIGHT REGION AND ITS APPLICATION FOR THE ELECTRON BEAM PROFILE MEASUREMENT

3W005 -- DEVELOPMENT OF C-BAND (5712 MHz) HIGH POWER WAVEGUIDE COMPONENTS

3W007 -- DEVELOPMENT OF C-BAND 50 MW PULSE KLYSTRON FOR e+ e- LINEAR COLLIDER

3W008 -- INPUT COUPLER DESIGN FOR C-BAND ACCELERATING STRUCTURE

4P032 -- CONSTRUCTION OF A 714-MHz RF SYSTEM FOR THE ATF DAMPING RING

4P033 -- DEVELOPMENT OF A BROADBAND HOM LOAD FOR THE 714-MHz HOM-DAMPED CAVITY

7C003 -- A LASER-HETERODYNE BUNCH-LENGTH MONITOR FOR THE SLC INTERACTION POINT

7P068 -- GROUND MOTION STUDIES FOR LARGE FUTURE LINEAR COLLIDERS

7P097 -- NLC KLYSTRON PULSE MODULATOR R&D AT SLAC

7P098 -- DEVELOPMENT OF THE PULSE TRANSFORMER FOR NLC KLYSTRON PULSE MODULATOR*

7W013 -- LOW-LEVEL RF SYSTEM DESIGN FOR THE ACCELERATOR TEST FACILITY (ATF) DAMPING RING

8W023 -- POSSIBILITY OF PRECISE WAKEFIELD MEASUREMENT AT ATF EXTRACTION LINE

9P068 -- A NEW MEASUREMENT METHOD OF THE DELAY LINE LENGTH IN THE X-BAND DELAY LINE DISTRIBUTION SYSTEM (DLDS)


Last modified: Mon Feb 26 11:34:00 JST 2007