ILC-Asia Logo

Welcome to ILC-Asia

Asian Regional Team for ILC Accelerator Development

KEK | KEK Home | KEK Acc. Lab. | GDE (ILC-World) | ILC-Asia Accelerator | ILC-Asia Physics
Overview
    Introduction (J)
    Introduction (E)
    What's New
    RSS Feed  RSS feed
LC Office
  Admin (J)
  Admin (E)
  Japanese Newsletter
GDE and RD
    SB2009
    TDP NEW!
    EMO/EDMS
    IDAG
    RDR
Research Activities
    ILC-Asia, WGs
    Visitors
    SC-RF
    Conv. Facilities
Meetings / Forums
    Local Meetings
    Regional Mtgs
    Internat'l Mtgs
    Mailing Lists
Test Facilities
    ATF
    ATF2
    STF
Library
    ILC-Asia Notes
    Photos
    Conferences
    References
    Lectures
    Reviews
    Reports
    Workshops
    KEK LC Proj. Comm.
Additional Resources
    World Efforts
    ILC Newsline (J)
    Useful Links
    Old News
Legacy Links




Contact the to send your comments, suggestions, broken links, and link requests.

Valid HTML 4.01!
[Valid RSS]

.





20101227Di-0083m.jpg

20101227Di-0171m.jpg

An EP Test Bench is being newly setup within the Chemical Laboratory building of KEK's Tsukuba Campus. This test bench is for conducting various studies of electro-polishing processes with small metal samples. It is intended to supplement the work at the EP facility for superconducting cavities with a small-scale and flexible laboratory with a fast turn-around in a well-controlled environment.

As of mid-December, 2010, the safety cabinet to enclose the test bench, sample holder, processing bath, DC power supply, temperature controller, scrubber and exhaust system are in place. After installation of the control computer and the remaining part of electric wiring, an initial test operation is scheduled for mid-January, 2011.


Archives of the images from the past top pages.
Last modified: Wed Dec 29 22:38:45 JST 2010